Friday, October 17, 2008

Making a Hollow Rotor Boot Cone Part 2

This morning I made a trip to the hardware store and the shop. I got the box built and will be close to ready to pour the plaster next time the north winds come.

The sides of the box:


Test fitting:


The base is just cardboard laminated with the Teflon tape. When the plaster dries I will turn the mold over and remove this part.


The edges and corners were caulked to prevent leaking.